Topforce reinforced concrete video
Topforce fibre reinforced concrete
vs
Steel reinforcing mesh with traditional ready mixed concrete video
Two construction sites have been filmed using time lapse video. One site is using steel mesh with one layer of A142, the smallest gauge of steel mesh. A concrete pumper was hired to pump the concrete into the placing area to create a concrete floor.
The other site is using Topforce reinforced concrete. The table below shows the details from both sites.
Topforce fibre reinforced concrete |
Traditional concrete slab |
|---|---|
| Topforce 40.5m3 foundation slab |
Ready mixed concrete 37.5m3 RC35 |
| Completion time: 8 hours 42 minutes | Completion time: 12 hours |
Find out more about Topforce reinforced concrete
Product and technical specification downloads
- Topforce product brochure (pdf, 852kb)
- Topforce technical Data sheet (pdf, 163kb)
- Topforce contractor guidelines (pdf, 173kb)
- BRE Certificate Responsible Sourcing for ready mixed concrete (pdf, 502kb)
Find out more...
- Email: topforce@tarmac.co.uk
- Send us an enquiry with your project requirements
- Get a Carbon Footprint calculation on this product
email: sustainability@tarmac.co.uk
Want us to ring you?
For any questions about Topforce email:
How do I specify Topforce?
- Grade of concrete
- Concrete slab thickness
- Grade of mesh
- Area in cubic metres(m3)
Read more on How to specify Topforce?

