A13 Pitsea Viaduct using Toproc
Tarmac National Contracting were instructed by their client Essex County Council to carry out both a geotechnical survey and to also conceive a design for the joint repairs on the A13 Pitsea
viaduct. .
Weston-super-Mare Seafront Enhancements - Phase 1 Marine Lake
By the time Phase 1 is complete, Tarmac will have supplied 2,500m3 of ready-mixed concrete to the foreshore area of the site from its ready-mixed concrete plant located in Weston-super-Mare. This includes 1200m3 of specialist Toproc UW microsilica concrete, which is designed specifically for underwater applications..
Blackpool Coastal Defence Scheme
The four-year contract will see the old structures replaced with 65,000 m3 of in situ concrete and 44,000m3 of precast concrete in grey, white and sand colours to blend in with the sea, beach and promenade.
MOD Otterburn Area Development
The major part of the project was the upgrading of 60km of blacktop roads to provide widened roads and strengthened carriageways with passing places and concrete road junctions.



